Climate
Fort Myers's humidity and CBS construction make hidden moisture the real risk.
Read local details
The Caloosahatchee River basin combines coastal humidity with a high water table — slab-on-grade homes commonly need 5–7 days of structural drying instead of the 3–4 days typical further inland. Below-grade vapor drive through unsealed slabs is a leading cause of recurring mold in ground-floor units.





